When a central London college redevelopment needed welfare and office space for 100 staff, the obvious solution—traditional modular cabins—was impossible.
❌ No crane access
❌ Low entrance clearance
❌ Minimum distruption to residents
So we did what we do best: flat pack innovation.
✅ Delivered 6 large flat pack offices through the low-access site
✅ Lifted components onto a raised scaffold gantry with a telehandler
✅ Installed everything within one week
The setup included 4 stand-alone offices and a 13m canteen space created by linking 2 units together. All pre-insulated and finished in white for a sleek, professional look.
This project proves why flat pack offices are the ultimate cost-effective solution for tricky urban sites:
✔ Flexible
✔ Easy to transport
✔ Simple to install
INSTAspace – making the impossible possible.
View our full range of INSTAspace garden offices HERE